Evidence status: Template only. Replace every project-specific statement with approved photographs, flowsheet records and operating data before public launch.
Original project problem
Document the customer’s actual problem here: clay-bound feed, uncontrolled boulders, poor classification, fine-gold loss, unstable water supply or a previous plant that did not match the material.
Evidence collected
List only information that can be supported:
- Representative feed photographs and sampling method
- Target and achieved feed rate
- Size distribution and visible gold observations
- Assay or test-work references
- Approved process and equipment records
Why the selected route was used
Explain the alternatives considered and why the final washing, classification and recovery stages matched the ore. Do not present the selected equipment as a universal alluvial gold package.
Results
Publish recovery, concentrate grade, production or commissioning data only when the measurement method and operating conditions are documented. Otherwise describe the delivered scope and the next verification step.